Do I require a silver label?
Used manufactured homes (whether de-registered with the BC Manufactured Home Registry or not) may only be offered for sale in BC when they bear an approval label. A new approval label is required where wiring of a used manufactured home has been completely removed and new wiring has been installed under a permit. Alterations, including additional wiring to an approved unit must be done under a permit and a new approval label is not required. When a manufactured home has had additions or outbuildings installed and wired without an electrical installation permit, an electrical contractor must obtain an installation permit, survey the work and submit a declaration confirming that the electrical installation is adequate for the purpose and in good order, in accordance with rule 2-300. Alternate documentation, such as a letter from the manufacturer indicating that the unit was originally approved, cannot be accepted in place of an approval label. However, if original documentation exists (for example, a specification sheet with CSA number) and there have been no unpermitted alterations to the unit, a silver label may be applied by a safety officer upon notification of an inspection request under a silver label permit and confirmation that the installation is in good order in accordance with rule 2-300. A Used Mobile Home Inspection Report is not required under these circumstances. The source is: https://www.technicalsafetybc.ca/regulatory-resources/regulatory-notices/information-bulletin-approval-manufactured-homes-and-factory-built-structures
Approval of Manufactured Homes and Factory-Built Structures Information Bulletin Print (PDF) Information Bulletin: Approval of Manufactured Homes and Factory-Built Structures March 31, 2015 Reference Number: IB-EL 2015-02 Revision Number: Rev 3 This bulletin provides guidance on the application of Electrical Safety Regulation, section 21. Overview An approval (silver) label will only be applied where no other approval process is available. An approval (silver) label will only be applied under a permit. Electrical Safety Regulation (ESR) 21 requires all new factory-built structures or manufactured homes to display an approval mark from an accredited certification agency prior to sale. When a label is not present, ESR 21(d) allows for used manufactured homes and used factory-built structures to display an approval label provided by the appropriate provincial safety manager. This is often referred to as a silver label. The authority having jurisdiction may set requirements for equipment that it deems “approved” as noted in the BC Electrical Code. If alterations have been made, these structures result in a blend of CSA Part I and Part II standards and are deemed acceptable with supporting evidence. Scope This bulletin only applies to factory-built structures and manufactured homes that are designed to be connected to an external electrical supply. It does not apply to recreational vehicles. For recreational vehicles, refer to the Electrical Directive: Recreational Vehicles (D-EL 2015-01). Definitions Approved (as applied to electrical equipment): Equipment certified by a Standards Council of Canada-accredited organization. Equipment that conforms to the requirements of the regulatory authority. Approval Label: A certification mark or silver label applied by an accredited certification body. Commercially Produced: A structure produced with an emphasis on salability or profit. Factory-Built Relocatable and Non-Relocatable Structures: See BC Electrical Code, rule 70-000. Manufactured Home: A transportable, single- or multiple-section dwelling ready for occupancy. Relocatable Structure: A towable structure for use without permanent foundations. Silver Label: An approval label provided by Technical Safety BC under section 21(1)(d) of the Electrical Safety Regulation. New Manufactured Homes Must conform to certification standards and display an approval mark. If missing an approval mark, the owner/vendor must apply to the certification agency. Used Manufactured Homes Can only be sold in BC if they bear an approval label. If completely rewired, a new approval label is required. Alterations must be done under a permit. Unpermitted electrical work must be surveyed by an electrical contractor. Original manufacturer documentation may be used if no alterations were made. If no evidence of approval exists, a licensed electrical contractor must: Obtain a silver label permit. Survey and ensure compliance using the Used Mobile Home Inspection Report Form. Submit the FRM-0206 Electrical Contractor Authorization and Declaration Form. New & Used Factory-Built Structures New structures must display an approval label. If no label exists, the owner/vendor must request a special inspection. Used factory-built structures can only be sold in BC if: They have an approval mark. The wiring has not been altered. If no evidence of approval exists, a licensed electrical contractor must: Obtain a silver label permit. Ensure compliance and submit FRM-0206. Exceptions A silver label permit may be issued if: No approval is possible through a certification agency. The safety officer confirms the unit is not commercially produced. A permit is obtained and a normal inspection is conducted. Upon approval, a silver label will be applied to the electrical panel cover. References Directive - D-EL 2015-01 Safety Standards Act Electrical Safety Regulation BC Electrical Code CAN/CSA-Z240 - MH Series-92
0
1
[ "[\"Entity_Error\", 1]", "[\"Negation\", 0]", "[\"Missing_Information\", 0]", "[\"Out_of_Reference\", 0]", "[\"Numerical_Error\", 0]" ]
Used manufactured homes, whether they are de-registered with the BC Manufactured Home Registry or not, may only be sold in BC if they display an approval label. If the wiring of a used manufactured home has been entirely removed and new wiring has been installed under a permit, a new approval label is necessary. Modifications, including adding wiring to an already approved unit, must be performed under a permit, and a new approval label is not needed. When additions or outbuildings have been installed and wired without an electrical installation permit, an electrical contractor is required to obtain an installation permit, assess the work, and submit a declaration confirming that the electrical setup is adequate for its intended use and in proper order, as per rule 2-300. Alternate documents, such as a letter from the manufacturer stating that the unit was originally approved, cannot substitute an approval label. However, if original documents exist (for instance, a specification sheet with a CSA number) and there have been no unauthorized modifications to the unit, a silver label may be issued by a safety officer upon notification of an inspection request under a silver label permit and verification that the installation is in proper order according to rule 2-300. A Used Mobile Home Inspection Report is not necessary in such cases.
Used manufactured homes (whether de-registered with the BC Manufactured Home Registry or not) may only be offered for sale in BC when they bear an approval mark. A new approval mark is required where wiring of a used manufactured home has been completely removed and new wiring has been installed under a permit. Alterations, including additional wiring to an approved unit must be done under a permit and a new approval label is not required. When a manufactured home has had additions or outbuildings installed and wired without an electrical installation permit, an electrical contractor must obtain an installation permit, survey the work and submit a declaration confirming that the electrical installation is adequate for the purpose and in good order, in accordance with rule 2-300. Alternate documentation, such as a letter from the manufacturer indicating that the unit was originally approved, cannot be accepted in place of an approval label. However, if original documentation exists (for example, a specification sheet with CSA number) and there have been no unpermitted alterations to the unit, a silver label may be applied by a safety officer upon notification of an inspection request under a silver label permit and confirmation that the installation is in good order in accordance with rule 2-300. A Used Mobile Home Inspection Report is not required under these circumstances.
[ 1 ]
[ "error" ]
0.8
How to get silver safety approval?
For Technical Safety BC silver label approval, where no evidence of current or previous approval is provided, a licensed electrical contractor must: 1. Obtain a silver label permit. 2. Survey the electrical installation and bring it into compliance using the Used Mobile Home Inspection Report Form, no. 1143. 3. When filling out the form, indicate survey results and identify all work performed to achieve compliance. 4. Submit FRM-0206 Electrical Contractor Authorization and Declaration Form confirming that the installation is adequate for the purpose and in good order, in accordance with rule 2-300. 5. Technical Safety BC will apply the silver label to the electrical panel cover once the installation is accepted. The source is: https://www.technicalsafetybc.ca/regulatory-resources/regulatory-notices/information-bulletin-approval-manufactured-homes-and-factory-built-structures
Approval of Manufactured Homes and Factory-Built Structures Information Bulletin Date: March 31, 2015 Reference Number: IB-EL 2015-02 Revision Number: Rev 3 This bulletin provides guidance on the application of Electrical Safety Regulation, section 21. Overview An approval (silver) label will only be applied where no other approval process is available. A silver label will only be applied under a permit. New factory-built structures and manufactured homes must display an approval mark from an accredited certification agency. Used manufactured homes and factory-built structures without an approval mark may display a silver label. Scope This bulletin only applies to factory-built structures and manufactured homes designed to connect to an external electrical supply. It does not apply to recreational vehicles. See the Electrical Directive: Recreational Vehicles (D-EL 2015-01). Definitions Approval Label: A certification mark or silver label. Commercially Produced: A structure built for sale or profit. Manufactured Home: A transportable dwelling (single or multiple sections). Relocatable Structure: A towable structure with provisions for utility connections. Silver Label: A permit-based approval label provided by Technical Safety BC. New Manufactured Homes Must conform to certification standards and display an approval mark. If missing an approval mark, the owner/vendor must apply for special inspection and labeling. Used Manufactured Homes Can only be sold in BC if they bear an approval label. If completely rewired, a new approval label is required. Alterations must be done under a permit. Unpermitted electrical work must be surveyed by an electrical contractor. Original manufacturer documentation may be used if no alterations were made. If no evidence of approval exists, a licensed electrical contractor must: Obtain a silver label permit. Ensure compliance using the Used Mobile Home Inspection Report Form. Submit the FRM-0206 Electrical Contractor Authorization and Declaration Form. New & Used Factory-Built Structures New structures must display an approval label. If no label exists, the owner/vendor must request a special inspection. Used factory-built structures can only be sold in BC if: They have an approval mark. The wiring has not been altered. If no evidence of approval exists, a licensed electrical contractor must: Obtain a silver label permit. Ensure compliance and submit FRM-0206. Exceptions A silver label permit may be issued if: No approval is possible through a certification agency. The safety officer confirms the unit is not commercially produced. A permit is obtained and a normal inspection is conducted. Upon approval, a silver label will be applied to the electrical panel cover. References Directive - D-EL 2015-01 Safety Standards Act Electrical Safety Regulation BC Electrical Code CAN/CSA-Z240 - MH Series-92
1
2
[ "[\"Entity_Error\", 2]", "[\"Negation\", 0]", "[\"Missing_Information\", 0]", "[\"Out_of_Reference\", 0]", "[\"Numerical_Error\", 0]" ]
To obtain silver label approval from Technical Safety BC when there is no evidence of current or past approval, a licensed electrical contractor must: 1. Acquire a silver label permit. 2. Assess the electrical installation and ensure compliance using the Used Mobile Home Inspection Report Form, no. 1143. 3. While completing the form, record the survey findings and detail all work done to achieve compliance. 4. Submit the FRM-0206 Electrical Contractor Authorization and Declaration Form, affirming that the installation is suitable for its intended purpose and in proper condition, as per rule 2-300. 5. Technical Safety BC will affix the silver label to the electrical panel cover after the installation is approved.
For Technical Safety BC silver label approval, when there is no proof of ongoing or past authorization, a licensed plumbing contractor must: 1. Obtain a silver label permit. 2. Survey the electrical installation and bring it into compliance using the Used Mobile Home Inspection Report Form, no. 1143. 3. When filling out the form, indicate survey results and identify all work performed to achieve compliance. 4. Submit FRM-0206 Electrical Contractor Authorization and Declaration Form confirming that the installation is adequate for the purpose and in good order, in accordance with rule 2-300. 5. Technical Safety BC will apply the silver label to the electrical panel cover once the installation is accepted.
[ 1, 1 ]
[ "1. A licensed electrical contractor must obtain a silver label permit.", "2. Survey the electrical installation and bring it into compliance using the Used Mobile Home Inspection Report Form, no. 1143.", "3. Indicate survey results and identify all work performed to achieve compliance when filling out the form.", "4. Submit FRM-0206 Electrical Contractor Authorization and Declaration Form confirming that the installation is adequate for the purpose and in good order, in accordance with rule 2-300.", "5. Technical Safety BC will apply the silver label to the electrical panel cover once the installation is accepted." ]
0.75
Can I confirm if a permit was pulled?
To confirm the existence of permits or inspections generated between 2013 and present-day, search1 for permits using our online tool. For permits or inspections prior to 2013, please contact us directly. If copies of the document are required, a formal ROI must be submitted. To avoid delays, requests should be submitted as soon as a property is listed or is expected to be listed. Requests are processed in the order in which they are received. *Note: We do not issue electrical and gas permits in all jurisdictions. The source is: https://www.technicalsafetybc.ca/contact/contact-us/request-information
Request Information – Technical Safety BC Make a Request Technical Safety BC provides access to information based on request type. If the information is needed for legal proceedings, review the policy on the release of information. Types of Requests 1. Informal Requests Access previously published materials like brochures, reports, and contractor lists. No charge for informal requests. To request, contact Technical Safety BC. 2. Freedom of Information (FOI) Requests Used for information not routinely made available to the public. Covered under the Freedom of Information and Protection of Privacy Act (FIPPA). Includes: Permits, certificates of inspection, compliance orders Complaints, violations, licensing, and qualifications Response time: within 30 days. If more time is needed, an estimate will be provided. Fees may apply. How to Make an FOI Request: Print and complete the Request for Information Form 1003. Send the form via email to foi@technicalsafetybc.ca OR mail to: Technical Safety BC Attn: Records, Information and Privacy Analyst Suite 600 - 2889 East 12th Avenue Vancouver, BC, Canada V5M 4T5 3. Personal Information Directory Technical Safety BC maintains a Personal Information Directory under Section 69(6) of FIPPA. Includes data organized by name, number, or identifier. Used to help the public find personal information held by Technical Safety BC. To access the directory, email foi@technicalsafetybc.ca. 4. Realtor Requests For permits and inspections from 2013 to the present, search using the online tool. For permits before 2013, contact Technical Safety BC directly. If copies are needed, a formal FOI request is required. Submit requests early when a property is listed to avoid delays. Note: Electrical and gas permits are not issued in all jurisdictions. Fees for FOI Requests Service Fee Retrieving a record (after the first 3 hours) $30/hour Producing a record (including copying time) $30/hour Preparing a record for disclosure and handling charges $30/hour Shipping a record At cost Photocopying (B&W) $0.25–$0.50 per page Colour printing $1.50–$1.75 per page Copying records (CDs, photos, oversized drawings) At cost Related Information Property Due Diligence Search Provides details on a property’s regulated work history and outstanding fees. Learn More. Complaints File complaints about policies, practices, or service. Learn More. Report an Incident Report incidents or hazards to Technical Safety BC. Learn More. Privacy & Cookies Technical Safety BC uses cookies and analytics for user experience improvements. Review the Privacy Policy and Cookie Policy.
2
1
[ "[\"Entity_Error\", 0]", "[\"Negation\", 0]", "[\"Missing_Information\", 0]", "[\"Out_of_Reference\", 0]", "[\"Numerical_Error\", 1]" ]
To verify the availability of permits or inspections issued from 2013 to the present, utilize our online tool to search for permits. For permits or inspections dated before 2013, please reach out to us directly. If you require copies of the documents, a formal Request for Information (ROI) must be submitted. To prevent delays, it is advisable to submit requests as soon as a property is listed or anticipated to be listed. Requests are handled in the sequence they are received. *Note: We do not issue electrical and gas permits across all jurisdictions.
To verify the availability of permits or inspections issued from 2015 to the present, utilize our online tool to search for permits. For permits or inspections dated before 2013, please reach out to us directly. If you require copies of the documents, a formal Request for Information (ROI) must be submitted. To prevent delays, it is advisable to submit requests as soon as a property is listed or anticipated to be listed. Requests are handled in the sequence they are received. *Note: We do not issue electrical and gas permits across all jurisdictions.
[ 1 ]
[ "1. To confirm the existence of permits or inspections generated between 2013 and present-day, search for permits using the online tool.", "2. For permits or inspections prior to 2013, contact the organization directly.", "3. If copies of the document are required, a formal ROI must be submitted.", "4. Requests should be submitted as soon as a property is listed or expected to be listed to avoid delays.", "5. Requests are processed in the order they are received.", "6. Electrical and gas permits are not issued in all jurisdictions." ]
1
How do I request a property due dilligence search?
Submit your application by email at contact@technicalsafetybc.ca with subject line ʻProperty Due Diligence Search – Site Address – Company nameʼ. Your Property Due Diligence Search request must include: A formal request letter with the following information: Site address PID (Parcel Identifier, a nine-digit number that uniquely identifies a parcel in the land title register in BC) Technologies (Identify all that apply from the list of regulated technologies below): Electrical equipment and systems Boilers and pressure vessels Refrigeration systems Natural gas and propane appliances and systems, including hydrogen Elevating devices, such as elevators and escalators Passenger ropeways, such as aerial trams and ski lifts Amusement devices Your contact details Authorization form signed by the property owner Required fee payment The source is: https://www.technicalsafetybc.ca/contact/contact-us/property-due-diligence-search
Extracted Context: Property Due Diligence Search – Technical Safety BC What is Property Due Diligence Search? A Property Due Diligence Search provides information about a property's regulated permitted work history and outstanding fees. Requires authorization from the current property owner. Typically requested by potential buyers, legal representatives, or real estate agents. Application Process Submit an application via email to contact@technicalsafetybc.ca with the subject line: "Property Due Diligence Search – Site Address – Company Name" Required Information: Formal request letter including: Site address PID (Parcel Identifier) Relevant regulated technologies from this list: Electrical systems Boilers & pressure vessels Refrigeration systems Gas appliances & systems Elevators & escalators Passenger ropeways (e.g., ski lifts) Amusement devices Contact details Authorization form signed by the property owner. Required fee payment. Fees One-hour administration fee per technology per site (PID). Example Calculation (2019 rates): $67/hour × 4 technologies = $268 Plus 5% GST ($13.40) = Total: $281.40 See Fee Schedule for updated rates. Processing & Response Time Applications are processed in order of receipt. Expect a response within 2-5 business days. Do not submit multiple requests for the same site. For questions, call 1-866-566-7233 and provide your support ID if available. Related Information Contact Us General inquiries: Contact Technical Safety BC Request Information Request specific information from Technical Safety BC: More Info 2025 Fee Schedules Learn how fees are set: Fee Schedules Privacy & Cookies Technical Safety BC collects user data for analytics and experience improvement. Review the Privacy Policy and Cookie Policy for details.
3
1
[ "[\"Entity_Error\", 0]", "[\"Negation\", 0]", "[\"Missing_Information\", 0]", "[\"Out_of_Reference\", 0]", "[\"Numerical_Error\", 1]" ]
Please submit your application via email to contact@technicalsafetybc.ca, using the subject line ʻProperty Due Diligence Search – Site Address – Company Nameʼ. Your request for a Property Due Diligence Search must include: a formal request letter that contains the following details: site address, PID (Parcel Identifier, a unique nine-digit number for each parcel in the BC land title register), a list of applicable technologies chosen from the regulated technologies below: electrical systems and equipment, boilers and pressure vessels, refrigeration systems, natural gas and propane appliances and systems, including hydrogen, elevating devices such as elevators and escalators, passenger ropeways like aerial trams and ski lifts, and amusement devices, your contact information, an authorization form signed by the property owner, and payment of the required fee.
Send your application by email at contact@technicalsafetybc.ca with the subject line ʻProperty Due Diligence Search – Site Address – Company nameʼ. Your Property Due Diligence Search request must include: a formal request letter with the following information: site address, PID (Parcel Identifier, a seven-digit number that uniquely identifies a parcel in the land title register in BC), technologies (Identify all that apply from the list of regulated technologies below): electrical equipment and systems, boilers and pressure vessels, refrigeration systems, natural gas and propane appliances and systems, including hydrogen, elevating devices, such as elevators and escalators, passenger ropeways, such as aerial trams and ski lifts, amusement devices, your contact details, authorization form signed by the property owner, and the required fee payment.
[ 2 ]
[ "1. Submit your application by email at contact@technicalsafetybc.ca with the subject line 'Property Due Diligence Search – Site Address – Company name'.", "2. Include a formal request letter with the site address and PID (Parcel Identifier).", "3. Identify all applicable technologies from the regulated list.", "4. Provide your contact details.", "5. Include an authorization form signed by the property owner.", "6. Ensure required fee payment is included." ]
1
How can I get copies of permits and inspection reports
FOI requests are used to access information that isn’t routinely made available to the public. Because we are subject to the  Freedom of Information and Protection of Privacy Act (FIPPA) , we must ensure that any requests for information that may contain third-party or personal information are reviewed to ensure compliance with FIPPA prior to disclosure. Examples include permits, certificates of inspection, compliance orders, complaints or violations, licensing, and qualifications. We will respond to your request within 30 days. In our response we’ll detail the next steps and, if applicable, the fees involved in processing your request. If your request is complex and needs longer than 30 days to process, we’ll send you a completion estimate with our initial response. How to make an FOI request: Print and complete the top part of the Request for Information Form 1003 (use additional sheets if required). Email us the completed form or mail to: Technical Safety BC Attn: Records, Information and Privacy Analyst Suite 600 - 2889 East 12th Avenue Vancouver, British Columbia, Canada V5M 4T5 The source is: https://www.technicalsafetybc.ca/contact/contact-us/request-information
Request Information - Technical Safety BC Types of Information Requests Informal Requests Used to access previously published information (brochures, reports, forms, contractor lists). No charge. Contact: Technical Safety BC. Freedom of Information (FOI) Requests Used to access non-public information (permits, inspection certificates, compliance orders, violations, licensing, qualifications). Subject to the Freedom of Information and Protection of Privacy Act (FIPPA). Processing time: 30 days (or more for complex cases). How to Submit an FOI Request Complete the Request for Information Form 1003. Send the completed form: Email: foi@technicalsafetybc.ca Mail: Technical Safety BC Attn: Records, Information and Privacy Analyst Suite 600 - 2889 East 12th Avenue Vancouver, BC, Canada, V5M 4T5 Fees for Formal Requests Service Fee Retrieving a record (after the first 3 hours) $30/hour Producing a record (including copying time) $30/hour Preparing a record for disclosure and handling $30/hour Shipping At cost Copying (8.5" x 11", B&W) $0.25 per page Copying (8.5" x 14", B&W) $0.30 per page Copying (11" x 17", B&W) $0.50 per page Color printouts (8.5" x 11") $1.50 per page Color printouts (8.5" x 14") $1.75 per page Compact discs, photographs, oversized plans At cost Other Related Requests Personal Information Directory A list of personal information banks held by Technical Safety BC. Available upon request: foi@technicalsafetybc.ca. Realtor Requests Permits and inspections from 2013 onward can be searched via the online permit search tool. Older records require an FOI request. Property Due Diligence Search Provides property history of regulated work and outstanding fees. Learn more: Property Due Diligence Search. Complaints & Incident Reports Report policy/service complaints: Make a Complaint. Report incidents/hazards: Report an Incident. Privacy & Legal Policy on Release of Information View policy on legal proceedings. Privacy & Cookie Policies Privacy Policy Cookie Policy
4
2
[ "[\"Entity_Error\", 1]", "[\"Negation\", 0]", "[\"Missing_Information\", 1]", "[\"Out_of_Reference\", 0]", "[\"Numerical_Error\", 0]" ]
FOI requests serve to obtain information that is not typically made accessible to the public. Since we are governed by the Freedom of Information and Protection of Privacy Act (FIPPA), we need to review any requests for information that might include third-party or personal data to ensure compliance with FIPPA before disclosure. Examples of such information include permits, inspection certificates, compliance orders, complaints or violations, licensing, and qualifications. We will reply to your request within 30 days. Our response will outline the subsequent steps and any applicable fees for processing your request. If your request is complicated and requires more than 30 days to process, we will provide an estimate of completion time in our initial response. To submit an FOI request, please print and fill out the top section of the Request for Information Form 1003 (using additional sheets if necessary). You can email us the completed form or send it by mail to: Technical Safety BC, Attn: Records, Information and Privacy Analyst, Suite 600 - 2889 East 12th Avenue, Vancouver, British Columbia, Canada, V5M 4T5.
FOI requests are used to access information that isn’t routinely made available to the citizens. Because we are subject to the Freedom of Information and Protection of Privacy Act (FIPPA), we must ensure that any requests for information that may contain third-party or personal information are reviewed to ensure compliance with FIPPA prior to disclosure. Examples include permits, certificates of inspection, compliance orders, complaints or violations, licensing, and qualifications. We will respond to your request within 30 days. In our response we’ll detail the next steps and, if applicable, the fees involved in processing your request. If your request is complex and needs longer than 30 days to process, we’ll send you a completion estimate with our initial response. How to make an FOI request: Print and complete the top part of the Request for Information Form 1003 (use additional sheets if required). Email us the completed form or mail to: Technical Safety BC Attn: Records, Information and Privacy Analyst Suite 600 - 2889 East 12th Avenue Vancouver, British Columbia, Canada.
[ 1, 6 ]
[ "1. FOI requests are used to access information not routinely available to the public.", "2. Requests are subject to the Freedom of Information and Protection of Privacy Act (FIPPA), ensuring compliance before disclosure.", "3. Examples of information accessible include permits, inspection reports, compliance orders, and licensing.", "4. Requests will be responded to within 30 days, detailing next steps and any applicable fees.", "5. For complex requests, a completion estimate will be provided if processing exceeds 30 days.", "6. To make an FOI request, complete the Request for Information Form 1003 and email or mail it to Technical Safety BC." ]
0.99
How can I apply for a 4th class power engineer certification?
To apply for your Fourth Class Power Engineer certificate, you must have one of the following: Proof of completing an approved Fourth Class Power Engineering course 1. Proof of completing a one-year, full-time Fourth Class Power Engineering course (no qualifying time required) 2. A Mechanical Engineering degree accredited by the Canadian Engineering Accreditation Board 3. Third Class or higher Marine Engineer (motor) certificate of competency Visit our list of approved courses and training providers https://www.technicalsafetybc.ca/technologies/boilers-pressure-vessels/power- engineer-certification/fourth-class To apply for evaluation, you must complete one of the following: 1. Six months as a Power Engineer in a Fifth Class plant in a position requiring a Fifth Class Power Engineer's certificate 2. Six months as a Power Engineer trainee in at least one of the following: a. A power plant that exceeds 10 sq. m of boiler capacity b. A steam heating plant that exceeds 30 sq. m of boiler capacity c. A fluid heating plant or low-pressure thermal fluid plant that exceeds 150 sq. m of boiler capacity d. A low-temperature, low-pressure fluid plant that exceeds 300 sq. m of boiler capacity 3. Eighteen months of experience, acceptable to a provincial safety manager, in the operation, design, construction, repair, or maintenance of equipment that falls under Power Engineer, Boiler, Pressure Vessel, and Refrigeration Safety Regulation 4. Third Class (or a higher class) Marine Engineer (motor) Certificate of Competency (issued by Transport Canada) 5. 200 hours of boiler plant power lab training at an educational or vocational facility approved by a provincial safety manager The source is: https://www.technicalsafetybc.ca/technologies/boilers-pressure-vessels/power- engineer-certification/fourth-class
Fourth Class Power Engineer Certification - Technical Safety BC Overview The Fourth Class Power Engineer Certificate of Qualification allows holders to: Serve as Chief Engineer of a plant with a corresponding or lower class. Work as a Shift Engineer in a plant up to one class higher. Be responsible for any refrigeration plant regardless of size. To obtain this certification, candidates must meet eligibility requirements, pass an evaluation, and complete two certification exams. Eligibility Requirements General Eligibility To apply, candidates must provide proof of one of the following: Completion of an approved Fourth Class Power Engineering course. Completion of a one-year, full-time Fourth Class Power Engineering course (no qualifying experience required). A Mechanical Engineering degree accredited by the Canadian Engineering Accreditation Board. A Third Class Marine Engineer (motor) Certificate of Competency issued by Transport Canada. List of Approved Courses & Training Providers Evaluation Eligibility To apply for an evaluation, candidates must meet one of the following experience requirements: Six months as a Power Engineer in a Fifth Class plant in a position requiring a Fifth Class Power Engineer's certificate. Six months as a Power Engineer trainee in a plant that exceeds the following boiler capacities: 10 sq. m (power plant) 30 sq. m (steam heating plant) 150 sq. m (fluid heating or low-pressure thermal fluid plant) 300 sq. m (low-temperature, low-pressure fluid plant) Eighteen months of acceptable experience in equipment operation, design, construction, repair, or maintenance related to Power Engineering, Boilers, Pressure Vessels, and Refrigeration Safety Regulation. A Third Class (or higher) Marine Engineer (motor) Certificate of Competency (issued by Transport Canada). 200 hours of boiler plant power lab training from an approved facility. Application Process Apply for Evaluation Complete the Plant Operating Experience Form 1026. Submit the completed form: Online: Log in to your Technical Safety BC account and upload the form. By Mail: Suite 600 - 2889 East 12th Avenue, Vancouver, BC V5M 4T5. New users: Sign up for an account. Exam Eligibility Candidates must meet general eligibility requirements before applying for exams. Exam Information Certification Exams 4A1 - Part A 4B1 - Part B Exam Format (as of March 1, 2023): 100 multiple-choice questions per exam. Duration: 3 hours. Minimum passing grade: 65%. Fourth Class Power Engineer Syllabus Related Certifications First Class Power Engineer Certification Second Class Power Engineer Certification Third Class Power Engineer Certification Fifth Class Power Engineer Certification Additional Information Certification Renewal Process for renewing Power Engineer certificates. Transfer to BC Required steps to transfer power engineering qualifications to BC. Find a Training Provider Recognized institutions offering Power Engineer courses. Privacy & Policies Privacy Policy Cookie Policy For additional inquiries, visit Technical Safety BC Contact Page.
5
1
[ "[\"Entity_Error\", 0]", "[\"Negation\", 0]", "[\"Missing_Information\", 0]", "[\"Out_of_Reference\", 0]", "[\"Numerical_Error\", 1]" ]
To obtain your Fourth Class Power Engineer certificate, you are required to provide proof of one of the following: completion of an approved Fourth Class Power Engineering course; completion of a full-time, one-year Fourth Class Power Engineering course (no qualifying experience necessary); a Mechanical Engineering degree recognized by the Canadian Engineering Accreditation Board; or a Third Class or higher Marine Engineer (motor) certificate of competency. For a list of approved courses and training providers, visit https://www.technicalsafetybc.ca/technologies/boilers-pressure-vessels/power-engineer-certification/fourth-class. To seek evaluation, you need to fulfill one of the following criteria: six months as a Power Engineer in a Fifth Class plant in a role that necessitates a Fifth Class Power Engineer's certificate; six months as a Power Engineer trainee in at least one of these options: a power plant with more than 10 sq. m of boiler capacity, a steam heating plant with over 30 sq. m of boiler capacity, a fluid heating plant or low-pressure thermal fluid plant exceeding 150 sq. m of boiler capacity, or a low-temperature, low-pressure fluid plant surpassing 300 sq. m of boiler capacity; eighteen months of experience, which must be deemed acceptable by a provincial safety manager, in the operation, design, construction, repair, or maintenance of equipment regulated under the Power Engineer, Boiler, Pressure Vessel, and Refrigeration Safety Regulation; a Third Class (or a higher class) Marine Engineer (motor) Certificate of Competency issued by Transport Canada; or 200 hours of boiler plant power lab training at an educational or vocational facility sanctioned by a provincial safety manager. The source is: https://www.technicalsafetybc.ca/technologies/boilers-pressure-vessels/power-engineer-certification/fourth-class.
To obtain your Fourth Class Power Engineer certificate, you are required to provide proof of one of the following: completion of an approved Fourth Class Power Engineering course; completion of a full-time, one-year Fourth Class Power Engineering course (no qualifying experience necessary); a Mechanical Engineering degree recognized by the Canadian Engineering Accreditation Board; or a Third Class or higher Marine Engineer (motor) certificate of competency. For a list of approved courses and training providers, visit https://www.technicalsafetybc.ca/technologies/boilers-pressure-vessels/power-engineer-certification/fourth-class. To seek evaluation, you need to fulfill one of the following criteria: six months as a Power Engineer in a Fifth Class plant in a role that necessitates a Fifth Class Power Engineer's certificate; six months as a Power Engineer trainee in at least one of these options: a power plant with more than 20 sq. m of boiler capacity, a steam heating plant with over 30 sq. m of boiler capacity, a fluid heating plant or low-pressure thermal fluid plant exceeding 150 sq. m of boiler capacity, or a low-temperature, low-pressure fluid plant surpassing 300 sq. m of boiler capacity; eighteen months of experience, which must be deemed acceptable by a provincial safety manager, in the operation, design, construction, repair, or maintenance of equipment regulated under the Power Engineer, Boiler, Pressure Vessel, and Refrigeration Safety Regulation; a Third Class (or a higher class) Marine Engineer (motor) Certificate of Competency issued by Transport Canada; or 200 hours of boiler plant power lab training at an educational or vocational facility sanctioned by a provincial safety manager. The source is: https://www.technicalsafetybc.ca/technologies/boilers-pressure-vessels/power-engineer-certification/fourth-class.
[ 1 ]
[ "1. To apply for the Fourth Class Power Engineer certificate, you must have proof of completing an approved Fourth Class Power Engineering course.", "2. You can complete a one-year, full-time Fourth Class Power Engineering course without needing qualifying time.", "3. A Mechanical Engineering degree accredited by the Canadian Engineering Accreditation Board is acceptable.", "4. A Third Class or higher Marine Engineer (motor) certificate of competency is also valid for application.", "5. To apply for evaluation, you need six months as a Power Engineer in a Fifth Class plant or as a trainee in specific types of power plants.", "6. Eighteen months of relevant experience in operation, design, construction, repair, or maintenance of equipment related to Power Engineering is required.", "7. A Third Class (or higher) Marine Engineer (motor) Certificate of Competency issued by Transport Canada is acceptable.", "8. Completing 200 hours of boiler plant power lab training at an approved educational or vocational facility is necessary." ]
0.95
How do I renew my Power engineer certiicate
While requirements for renewal may differ depending on your technology, applications can be submitted through your Online Services account. There may be additional educational requirements necessary for your renewal. Visit the renewal page specific to your technology to learn more The source is: https://www.technicalsafetybc.ca/apply-for/certificate-renewals
Certification Renewal - Technical Safety BC Ensure You’re Qualified to Work A valid Certificate of Qualification is required to perform regulated work. Renew early to avoid delays or disruptions. Renew Now When to Renew Renewal timing varies by technology. Check your certificate expiry date and renew via Online Services. Renew within one year before expiration to prevent work interruptions. How to Renew Log in to your Online Services account. Follow the renewal process specific to your technology. Additional educational requirements may be necessary. Need an account? Register here. Consequences of an Expired Certificate Working with an expired certificate is illegal If you do not renew: You risk compliance orders and monetary penalties. You must re-apply for a new certificate. If expired for three years, your certificate closes permanently. Renewal by Technology FSR Certification Renewal Gas Certification Renewal Power Engineer Certification Renewal Elevating Devices Mechanic (EDM) Certification Renewal Related Information Compliance & Enforcement Regulatory Framework Learning Centre - Training & Safety Courses Privacy & Policies Privacy Policy Cookie Policy For more details, visit Technical Safety BC.
6
2
[ "[\"Entity_Error\", 1]", "[\"Negation\", 0]", "[\"Missing_Information\", 1]", "[\"Out_of_Reference\", 0]", "[\"Numerical_Error\", 0]" ]
Although the requirements for renewal can vary based on your technology, applications may be submitted through your Online Services account. Additional educational prerequisites might be required for your renewal. To find out more, visit the renewal page that pertains to your specific technology.
While requirements for renewal may differ depending on your equipment, applications can be submitted through your Online Services account. There may be additional information necessary for your renewal. Check the renewal page specific to your technology to learn more.
[ 1, 2 ]
[ "1. Requirements for renewal may differ depending on your technology.", "2. Applications can be submitted through your Online Services account.", "3. There may be additional educational requirements necessary for your renewal.", "4. Visit the renewal page specific to your technology to learn more." ]
0.95
I would like to renew my FSR, what do I need to do?
If you don’t have an Online Services account, have the following information ready: 1. Your FSR certificate number 2. Your current mailing address 3. Your email address You should also make sure that you have completed your continuing education requirements from an approved training provider. The source is: https://www.technicalsafetybc.ca/technologies/electrical/electrical-fsr- certification/renewal
{"metadata": {"application-name": "Technical Safety BC", "viewport": "width=device-width,initial-scale=1,minimum-scale=1", "theme-color": "#00497B", "title": "Electrical FSR - Certificate Renewal | TSBC", "description": "Your Electrical FSR Certificate of Qualification must be renewed every three years with proof of continuing education. Here\u2019s how to renew.", "keywords": "electrical fsr, renewal, certification, renew, certificate"}, "markdown": "# Certification Renewal\n\n#### Electrical FSR Certification\n\nPrint (PDF)\n\n### Renew Now\n\n[ Online Services Have an FSR account? Process your renewal through our online services. ](https://portal.technicalsafetybc.ca/login)\n\n[ Online Services Need an account? Register for an online services account to access your latest certificate information. ](https://portal.technicalsafetybc.ca/new-sign-up)\n\n### Certification Renewal\n\n###### When Do I Need to Renew?\n\nIf your certificate can be renewed, you can renew your certificate up to 1 year in advance of its expiration date. Renewing early does not reduce the time of your certificate being in an \u2018active\u2019 status.\n\nYour certificate can be renewed using your [Online Services account](https://portal.technicalsafetybc.ca/new-sign-up) if you\u2019re within 1 year of your certificate\u2019s expiration date. If you don\u2019t have an Online Services account, you can call us at 1 866 566 7233. You can also renew your certificate if it expires.\n\n###### What Do I Need in Order to Renew?\n\nIf you don\u2019t have an [Online Services account](https://portal.technicalsafetybc.ca/new-sign-up), have the following information ready:\n\n * Your FSR certificate number\n * Your current mailing address\n * Your email address\n\n\n\nYou should also make sure that you have completed your continuing education requirements from an [approved training provider](/technologies/electrical/electrical-fsr-certification/find-a-training-provider).\n\n###### How to Renew Your Certification\n\nTo renew your certificate, simply [log in to your Online Services](https://portal.technicalsafetybc.ca/login) account and click Certifications on the left side. Then click Proceed to Online Services for Certification and you\u2019ll be directed to your My Certificates page.\n\n 1. Once you\u2019re there, click the Action dropdown on the certificate you want to renew and select Renew Certificate.\n 2. Complete and submit your renewal. You may see a pro-rated fee that reflects the time between your old expiration date and your new renewal date (your birth date).\n\n\n\n###### Continuing Education Requirements\n\nThe Electrical Safety Regulation (section 10.1) requires you to satisfy continuing education requirements before renewing your FSR certificate of qualification. There are different continuing education requirements depending on your certificate class. You can find information about training providers [here](https://www.technicalsafetybc.ca/technologies/electrical/electrical-fsr-certification/find-a-training-provider).\n\nOnce you have completed a continuing education course, hold onto the course completion document. You\u2019ll need to have this document when you fill out your renewal application.\n\n**Note:**\n\n2024 Canadian Electrical Code renewal courses are required to satisfy continuing education requirements. 2021 Canadian Electrical Code update training completed before the adoption of the 2024 Canadian Electrical Code, is no longer accepted as of March 3, 2026.\n\nFSRs who choose to retake a certification code course on the 2024 Canadian Electrical Code, which covers all sections of the code relevant to their FSR class, not only the updates to the code from the previous version, may also be allowed to renew their certificate of qualification on that basis.\n\n###### FSR Classes A, B or C\n\nTo renew your class A, B, or C FSR certificate of qualification, you **must complete one of the following** :\n\n * 8 hours of continuing education with a [recognized training provider](/technologies/electrical/electrical-fsr-certification/find-a-training-provider).\n * Self-study and **pass a renewal exam** to challenge the continuing education requirements.\n\n\n\nIf you choose to pursue continuing education, you must complete the required 8 hours before renewing. If you choose to take the renewal exam, know that it can only be taken once.\n\n###### FSRs Holders With Multiple Certificate Classes\n\nFSRs who hold unrestricted A, B, or C certificates must take an 8-hour course. FSRs who do not hold an unrestricted certification must take a 4-hour course. Please see a list of [external training providers](/technologies/electrical/electrical-fsr-certification/find-a-training-provider) and sign up for a course.\n\n###### FSR Restricted Classes\n\nYou must complete **4 hours** of continuing education with a [recognized training provider](/technologies/electrical/electrical-FSR-certification/find-a-training-provider) to renew your restricted [FSR class](/technologies/electrical/electrical-fsr-certification) certificate of qualification. \n\nThe following continuing education training will be accepted:\n\nOption 1:\n\n * A course consisting of a minimum of 4 hours on the 2024 Canadian Electrical Code which must include the code update as outlined in section 3.3 of this syllabus. The code update course will require evaluation and recognition by Technical Safety BC;\n\n\n\nOption 2:\n\n * A course consisting of a minimum of 1 hour on the 2024 Canadian Electrical Code update as outlined in section 3.3 of this syllabus. The code update course will require evaluation and recognition by Technical Safety BC; and \n * One or more additional courses that add to the 1-hour code update course listed above to make up the total 4-hour requirement for continuing education. Such courses shall be directly related to regulated activities certificate holders are required to perform within the scope of their certificate class. These courses will not require evaluation and recognition by Technical Safety BC. Acceptable training topics shall fall under one or a combination of the following categories: \n * **Trade specific safety training.** Examples of such training may include Arc Flash & Shock, HAZLOC, Fall Protection, etc.\n * **Technical training.** Examples of such training may include product specific training, employer provided procedural training on how to install or service various products, etc. Manufacturer product specific training, other than that intended for promotional, or sales use is also acceptable.\n\n\n\n###### Consequences of Working with Expired Credentials\n\nIf you do not renew your certificate but continue to perform regulated work, you put yourself and others at risk. Failure to renew your certificate will result in the following:\n\n * A safety officer may issue a compliance order, or recommend a monetary penalty.\n * A safety officer may be authorized to stop your work in the field.\n * If you are named as the primary FSR on a contractor license, the contractor licence status will be put on hold, along with any associated installation or operating permits.\n * You cannot be named on any new or renewed operating permits, installation permits, temporary construction permits, and contractor licences.\n * You cannot assess compliance with codes and regulations.\n * You cannot submit declarations for installation permits which you are named on.\n * You cannot obtain new installation permits.\n * You cannot represent an asset owner on any new or existing operating permit(s).\n\n\n\n###### Grandparented Classes\n\nTo complete your continuing education, register for a 4-hour online course applicable to your certificate class with an [external recognized training provider](https://www.technicalsafetybc.ca/technologies/electrical/electrical-fsr-certification/find-a-training-provider).\n\n**Note** : Grandparented classes were closed and existing FSR certifications underwent a name change during 2021 FSR renewal. As of March 7, 2022, Skilled Trades BC Regulation came into effect with mandatory trades. Please refer to [Skilled Trades BC Act](https://www.bclaws.gov.bc.ca/civix/document/id/bills/billsprevious/3rd42nd:gov04-3) for more information.\n\nCertification Renewal\n\nWhen Do I Need to Renew?\n\nWhat Do I Need in Order to Renew?\n\nHow to Renew Your Certification\n\nContinuing Education Requirements\n\nFSR Classes A, B or C\n\nFSRs Holders With Multiple Certificate Classes\n\nFSR Restricted Classes\n\nConsequences of Working with Expired Credentials\n\nGrandparented Classes\n\n### Related Information\n\nFSR CERTIFICATION\n\n#### Exam Information\n\nFind out everything you need to know about your Electrical FSR exam.\n\n[Learn More](/technologies/electrical/electrical-FSR-certification/exam-information)\n\nFSR CERTIFICATION\n\n#### Transfer to BC\n\nIf you have qualifications and experience from outside BC, you need a certificate in order to work as an Electrical Field Safety Representative in this province.\n\n[Learn More](/technologies/electrical/electrical-FSR-certification/transfer-to-bc)\n\nFSR CERTIFICATION\n\n#### Find a Training Provider\n\nFind a recognized training provider in your area for courses related to the Electrical FSR certificate.\n\n[Learn More](/technologies/electrical/electrical-FSR-certification/find-a-training-provider)\n\nTechnical Safety BC uses cookies and similar technologies to understand how users interact with our website and to enhance user experience and analytics. To learn more about these technologies, including how to disable them, consult our [Privacy Policy](/privacy-policy) and our [Cookie Policy](/cookie-policy).\n\nI understand\n\nEdit\n", "links": ["https://portal.technicalsafetybc.ca/login", "https://portal.technicalsafetybc.ca/new-sign-up", "https://portal.technicalsafetybc.ca/report-incident/incident-reporting-form", "https://www.technicalsafetybc.ca/", "https://www.technicalsafetybc.ca/contact/contact-us", "https://www.technicalsafetybc.ca/cookie-policy", "https://www.technicalsafetybc.ca/privacy-policy", "https://www.technicalsafetybc.ca/technologies", "https://www.technicalsafetybc.ca/technologies/electrical", "https://www.technicalsafetybc.ca/technologies/electrical/electrical-FSR-certification/exam-information", "https://www.technicalsafetybc.ca/technologies/electrical/electrical-FSR-certification/find-a-training-provider", "https://www.technicalsafetybc.ca/technologies/electrical/electrical-FSR-certification/transfer-to-bc", "https://www.technicalsafetybc.ca/technologies/electrical/electrical-fsr-certification", "https://www.technicalsafetybc.ca/technologies/electrical/electrical-fsr-certification/find-a-training-provider", "https://www.technicalsafetybc.ca/terms-use"]}
7
1
[ "[\"Entity_Error\", 0]", "[\"Negation\", 1]", "[\"Missing_Information\", 0]", "[\"Out_of_Reference\", 0]", "[\"Numerical_Error\", 0]" ]
If you do not possess an Online Services account, ensure you have the following information at hand: 1. Your FSR certificate number 2. Your current mailing address 3. Your email address. Additionally, it is important to verify that you have fulfilled your continuing education obligations from a recognized training provider.
If you do not possess an Online Services account, ensure you do not have the following information at hand: 1. Your FSR certificate number 2. Your current mailing address 3. Your email address. Additionally, it is important to verify that you have fulfilled your continuing education obligations from a recognized training provider.
[ 2 ]
[ "1. If you don’t have an Online Services account, have your FSR certificate number ready.", "2. Prepare your current mailing address.", "3. Provide your email address.", "4. Ensure that you have completed your continuing education requirements from an approved training provider." ]
0
How can I get a new welder logbook?
Skilled Trades BC. The source is: https://www.technicalsafetybc.ca/technologies/boilers-pressure-vessels/pressure-welder-certification/class-a
Class A Pressure Welder Certification - Technical Safety BC Overview The Class A Pressure Welder Certificate allows you to perform pressure welding on regulated equipment while employed by a licensed contractor. This certification is ideal for: Graduates of Skilled Trades BC welder trade certification programs. Pressure welders from other provinces who may be eligible for a direct transfer to BC. Practical Exam Overview Eligibility Requirements To apply, you must have one of the following: ✔ BC Welder Certificate issued by Skilled Trades BC (with Red Seal credential). ✔ BC Welder Level A or B Certificate issued by Skilled Trades BC. ✔ Welder trade qualification (with or without Red Seal) from another Canadian province. Transfer to BC About the Exam Duration: 4.5 hours Format: Practical test under supervision of Technical Safety BC safety officers. Locations: Must be completed at a recognized test administrator location. Find a test administrator 📄 Class A Pressure Welder Syllabus After Certification: Next Steps 🔹 Obtain a Welder’s Log Book from Skilled Trades BC. 🔹 Complete Performance Qualification Tests (before welding on regulated equipment). 🔹 Keep continuity (employment) records updated per ASME Section IX requirements. 🔹 Renew certification every 3 years → Learn More You May Also Be Interested In Pressure Welder Exam Information Pressure Welder Certificate Renewal Transfer to BC Find a Test Administrator Other Certification Paths Class IT Pressure Welder Class R Pressure Welder 📌 General Pressure Welder Certification Technical Safety BC Policies 🔹 Privacy Policy 🔹 Cookie Policy For more details, visit Technical Safety BC.
8
1
[ "[\"Entity_Error\", 1]", "[\"Negation\", 0]", "[\"Missing_Information\", 0]", "[\"Out_of_Reference\", 0]", "[\"Numerical_Error\", 0]" ]
The Class A Pressure Welder Certificate permits you to carry out pressure welding on regulated equipment while working for a licensed contractor. This certification is suitable for: Graduates of the welder trade certification programs from Skilled Trades BC. Pressure welders from other provinces who may qualify for a direct transfer to British Columbia. Eligibility Requirements To apply, you must possess one of the following: ✔ BC Welder Certificate granted by Skilled Trades BC (with Red Seal credential). ✔ BC Welder Level A or B Certificate issued by Skilled Trades BC. ✔ Welder trade qualification (with or without Red Seal) from another province in Canada. About the Exam Duration: 4.5 hours Format: Practical examination under the oversight of Technical Safety BC safety officers. Locations: Must be completed at a recognized test administrator's venue. After Certification: Next Steps 🔹 Acquire a Welder’s Log Book from Skilled Trades BC. 🔹 Finish Performance Qualification Tests (prior to welding on regulated equipment). 🔹 Maintain continuity (employment) records according to ASME Section IX requirements. 🔹 Renew certification every three years → Learn More
The Class A Pressure Welder Certificate allows you to perform pressure welding on regulated equipment while employed by a licensed contractor. This certification is ideal for: Graduates of Skilled Trades AB welder trade certification programs. Pressure welders from other provinces who may be eligible for a direct transfer to BC. Eligibility Requirements To apply, you must have one of the following: ✔ BC Welder Certificate issued by Skilled Trades BC (with Red Seal credential). ✔ BC Welder Level A or B Certificate issued by Skilled Trades BC. ✔ Welder trade qualification (with or without Red Seal) from another Canadian province. About the Exam Duration: 4.5 hours Format: Practical test under supervision of Technical Safety BC safety officers. Locations: Must be completed at a recognized test administrator location.
[ 3 ]
[ "1. Contact Skilled Trades BC to obtain a new welder logbook." ]
0.85
How do I apply for a Gas license?
There are two ways of applying for your contractor’s license: 1. Hardcopy Original Surety Bond • Complete the Gas Contractor Licence Application form 514. • Provide an original signed hardcopy surety bond with your application. • Mail in the application form and bond to the Technical Safety BC Vancouver office. 2. Electronic Bond (E-bond) • Complete the Gas Contractor Licence Application form 514. • Provide a copy of your signed electronic surety bond with your application. • Submit the completed application as a PDF via our contact form. To be considered valid, original hardcopy bonds and electronic bonds must contain all of the following: 1. Bond number 2. Bond Amount: $10,000 3. Full legal business name. The name on the bond documents must be the same as the company name provided on the application and both must match exactly with the full legal business name registered in BC. 4. Obligee: British Columbia Safety Authority. The name of the “Obligee” listed on the bond should be “British Columbia Safety Authority” as this remains our legal name. 5. Principal’s signature 6. Insurer’s signature 7. Seal 8. Date *We will accept electronic bonds from an insurer who has Power of Attorney for an insurance company. This must be demonstrated by a Power of Attorney letter supplied by the insurance broker or insurer at the time of submitting the electronic bond. The source is: https://www.technicalsafetybc.ca/technologies/gas/gas-licences
Gas Licences - Technical Safety BC Overview To perform regulated gas work in British Columbia, you must: Hold a valid gas licence issued by Technical Safety BC. Be employed by a licensed contractor. Be authorized to perform the work independently. Licensed Contractors must ensure compliance with: ✔ Safety Standards Act ✔ Relevant BC gas regulations ✔ Applicable safety orders & directives (View Notices) Gas Contractor Responsibilities ✔ Maintain knowledge of Safety Standards Act & Gas Code Books (CSA-B149.1). ✔ Obtain permits before performing regulated gas work. ✔ Ensure all employees are licensed gas fitters. ✔ Install certified and approved gas appliances. ✔ Report gas-related explosions, fires, or hazards to a safety officer. ✔ Correct errors & rejections related to gas work promptly. ✔ Maintain a valid surety bond at all times. ⚠ Failure to comply may lead to: Fines, licence suspension, or revocation by Technical Safety BC. How to Apply for a Gas Licence ✔ Apply Online: Log in to Online Services ✔ New User? Sign up for an account ✔ By Phone: Call 1-866-566-7233 ✔ In Person: Visit a Technical Safety BC office 📌 Faster Processing: Online applications are processed 6 days faster than paper applications. What You Need to Apply ✔ Business Name & Registration: Your business must be registered with BC Business Registry. ✔ Surety Bond: Upload a photo/PDF of your bond when applying online. ✔ Application Fee: Payable via credit card (online) or contact support for other options. Renewing Your Gas Licence ✔ Renew annually (can be renewed up to 6 months before expiration). ✔ Log in & renew online for faster processing. ✔ Renewal fees are non-refundable and must be paid during submission. Updating Your Licence ✔ Change of Business Name: Request a name update with BC Business Registry. Obtain a bond rider from your insurer & submit it via the contact form. ✔ Update Your Bond: Log in to Online Services and select "Renew or manage licences". Find a Licensed Contractor Use our lookup tool to find a licensed gas contractor in your area: 🔍 Find a Contractor Related Information 🔹 Surety Bonds for Gas Licences 🔹 Technical Safety BC Online Services 🔹 Contact Technical Safety BC 📌 Legal & Privacy Notices Privacy Policy Cookie Policy
9
1
[ "[\"Entity_Error\", 0]", "[\"Negation\", 0]", "[\"Missing_Information\", 0]", "[\"Out_of_Reference\", 0]", "[\"Numerical_Error\", 1]" ]
You can apply for your contractor's license in two ways: 1. Hardcopy Original Surety Bond • Fill out the Gas Contractor Licence Application form 514. • Attach an original signed hardcopy surety bond with your application. • Send the application form and bond to the Technical Safety BC Vancouver office by mail. 2. Electronic Bond (E-bond) • Fill out the Gas Contractor Licence Application form 514. • Include a copy of your signed electronic surety bond with your application. • Submit the completed application as a PDF through our contact form. For bonds to be considered valid, both original hardcopy bonds and electronic bonds must include all of the following: 1. Bond number 2. Bond Amount: $10,000 3. Full legal business name. The name on the bond documents must match exactly with the company name provided on the application and both must correspond with the full legal business name registered in BC. 4. Obligee: British Columbia Safety Authority. The 'Obligee' listed on the bond should be 'British Columbia Safety Authority' as this is our legal name. 5. Principal’s signature 6. Insurer’s signature 7. Seal 8. Date *We will accept electronic bonds from an insurer that has Power of Attorney for an insurance company. This must be evidenced by a Power of Attorney letter provided by the insurance broker or insurer at the time of submitting the electronic bond.
You can apply for your contractor's license in two ways: 1. Hardcopy Original Surety Bond • Fill out the Gas Contractor Licence Application form 514. • Attach an original signed hardcopy surety bond with your application. • Send the application form and bond to the Technical Safety BC Vancouver office by mail. 2. Electronic Bond (E-bond) • Fill out the Gas Contractor Licence Application form 514. • Include a copy of your signed electronic surety bond with your application. • Submit the completed application as a PDF through our contact form. For bonds to be considered valid, both original hardcopy bonds and electronic bonds must include all of the following: 1. Bond number 2. Bond Amount: $20,000 3. Full legal business name. The name on the bond documents must match exactly with the company name provided on the application and both must correspond with the full legal business name registered in BC. 4. Obligee: British Columbia Safety Authority. The 'Obligee' listed on the bond should be 'British Columbia Safety Authority' as this is our legal name. 5. Principal’s signature 6. Insurer’s signature 7. Seal 8. Date *We will accept electronic bonds from an insurer that has Power of Attorney for an insurance company. This must be evidenced by a Power of Attorney letter provided by the insurance broker or insurer at the time of submitting the electronic bond.
[ 2 ]
[ "1. There are two ways to apply for a Gas contractor's license: Hardcopy Original Surety Bond and Electronic Bond (E-bond).", "2. For Hardcopy Original Surety Bond, complete the Gas Contractor Licence Application form 514 and provide an original signed hardcopy surety bond with the application, then mail it to the Technical Safety BC Vancouver office.", "3. For Electronic Bond (E-bond), complete the Gas Contractor Licence Application form 514 and provide a copy of the signed electronic surety bond, then submit the application as a PDF via the contact form.", "4. The following must be included in both original hardcopy and electronic bonds: Bond number, Bond Amount ($10,000), Full legal business name matching the application, Obligee as 'British Columbia Safety Authority', Principal's signature, Insurer's signature, Seal, and Date.", "5. Electronic bonds must come from an insurer with Power of Attorney, demonstrated by a Power of Attorney letter supplied at the time of submission." ]